WattStation
With a user-friendly design and simple functionality, the WattStation electric vehicle charger shrinks Electric Vehicle (EV) charging time from 12-to-18 hours down to as little as 4-to-8 hours compared with standard plug-in charging - assuming a 24 kw battery and a full-cycle charge. WattStation’s smart grid technology lets utility companies manage the impact of EVs on local and regional grids. The modular design can be upgraded to accommodate new communication technologies as they become available.
Features & Benefits
-
Design allows integration into smart electrical distribution systems
-
Level 2 charging (208-240 VAC) at home and on the road
-
Light-Emitting Diode (LED) lights and display
-
Revenue grade metering with AMI communications
-
Commercial property owners can quality for Local Economic Empowerment Development Strategy (LEEDS) points
-
Certified technicians available for reliable home installation
-
Built-in support for two-way communication between the utility and charging station
-
Commerce and card-reader capability
MORE ABOUT THIS TOPIC
- GE Energy Launches the Fully Networked WattStation™ and WattStation Connect Software, a Complete Electric Vehicle Charging Platform
- GE Energy Strengthens Its Sales Operations in Canada to Better Serve Market
- Coda and General Electric, Joined at the Power Cord
- REC Solar Partners with GE as Solar EV Convergence Gains Traction
