Nuclear Services - Modifications Services
GE Hitachi Nuclear Energy utilizes decades of experience servicing Boiling Water Reactors (BWRs) to provide the same repair and engineering services to our Pressurized Water Reactors (PWR) customers. With extensive experience in mitigating Stress Corrosion Cracking in BWR plants since the 1970s, GEH is now offering that expertise and more in the Alloy 600 portfolio of products and services to our PWR customers.
Features & Benefits
- ReNew* Surface Improvement is a quick, cost-effective process that removes damaging surface cold-work caused by excessive grinding or machining.
- Weld Overlay - Structural or Preventive utilizes GEH's extensive experience with engineering, analysis, design, ASME Code, and regulatory issues.
- Corrosion-Resistant Cladding is a proven automated treatment that protects surfaces from Primary Water Stress Corrosion Cracking (PWSCC).
- Non-Destructive Evaluation (NDE) is a complete Appendix VIII Qualification program. GEH has the most qualified and flexible workforce in the field.
